- Install on a raised platform.
- Good Ventilation, Illumination and Minimum Vibration.
- No water/oil pipe
passing over MSB.
- Operating floor
space in front and behind must be covered with anti-skid, insulated rubber mats with minimum
thickness of atleast 15mm.
- Panel Doors should
be in locked position at all times.
- Door opening mechanism must be
interlocked with power supply.
- The enclosure should
be drip proof.
- MSB should be Dead front type (i.e, all the line
conductor should pass behind MSB).
- Every equipment and
MSB to be earthed.
- Every incoming and
outgoing feed wire must be protected
by Circuit Breaker or Switch Fuse.
- Insulation
resistance should not be less than 1 mega ohm in any case.
- Insulation Resistance to be checked at regular
intervals as per the SMS Guide book.
- All meters to be
calibrated and records maintained on regular basis.
- All components, i.e,
switches, gauges, meters, fuses, push buttons, circuit breaker, indicating
lamps should be in working condition and identified with the name tag.
- All the interlocks must be verified
frequently.
- Operating switches
gear, tools such as circuit breaker handle, fuse puller, lamp grips etc
must be readily available.
- Red Tag/Name plate
indicating high voltage and danger
sign should be fitted.
- Fire fighting
equipment available nearby,i.em CO2/ DCP type.
Friday 22 July 2016
MSB: Safeties, Protection & Maintenance!
Subscribe to:
Post Comments (Atom)
Meo class 2 written questions ( previous years)
MEO class 2 written questions. previous yeas JAN 2016 - JULY 2017)
-
PURIFIERS Some useful links for purifier construction and working: http://www.marineinsight.com/marine/marine-news/headlin...
-
Electrical Survey: Electrical equipment inspected and tested, during complete engine survey, at 4 years interval. Such a survey is pres...
-
STEERING GEAR KNOWLEDGE: WHAT IS SAFEMATIC STEERING ? Structural features: Complies with the latest rules and regulation...
No comments:
Post a Comment